Software that keeps NDT teams compliant.

Login

Records

NDT Inspection Records Software

Inspection history

An inspection report that cannot name the asset, the procedure revision, and the technician is only a file. SpecNDT keeps those three attached, so the team can show the work was compliant.

Oil and gas NDT produces a lot of paper for a simple reason. A later inspector, a client, or an auditor has to find what was done, to which asset, under which procedure, and by whom.

SpecNDT is where those connections live. A later reader can see the inspection under the procedure that applied, performed by a person who was qualified that day.

The revision that was in force

Procedures change. The copy on the truck and the copy in the office drift apart, and a shared drive keeps three files named final. The record of the work should point at the revision that applied that day, not at whatever was saved last week.

Superseded procedures stay visible as history. They stop being the copy the team opens by habit.

The asset, not the folder

API 510, API 570, and API 653 inspections, and the NDT that supports them, belong to equipment. A thickness reading, a weld record, or a visual report is hard to use later if the only index is the year it was scanned.

SpecNDT ties the report to the asset and keeps the history on that asset. It does not calculate remaining life, and it does not replace an authorized inspector. Those judgments stay with the people qualified to make them.

The technician on that day

The report should name the person, and that person should have been qualified for the method, at that level, on that date. Certification records and inspection records answer one question from either side: was the person who did this work qualified when they did it?

What a compliant week looks like

  • You can pull the procedure revision that applied to a named inspection.
  • You can show the technician's qualification as it stood that day.
  • You can list what is overdue before anyone asks.
  • A finding stays with the asset instead of living in a spreadsheet tab.

That is the state SpecNDT holds for the team. The week of the audit should look like any other week.

For the longer version, see what audit-ready means for oil and gas NDT records.

Request access